This varied accompanying programme may be tailored to the group’s individual needs and consists of different team elements. The format is flexible and is therefore suitable for integrating subjects specific to the groups into the programme. One task, for example, is to get different teams to build stable bamboo towers that are as high as possible from individual parts. Communication between the teams and mutual understanding are particularly important here. The blind walk, on the other hand, is designed to strengthen trust within the group. While the bridge-building activity requires the participants to work together and find a way to cross an obstacle. Those who are looking for an extra portion of fun will find it in the Segway races in summer or in winter at the Zipflbobrennen (Summit Bobsleigh Race). The eventful day ends with a cosy campfire and twist bread.
- Duration: 4-6 hours
www.event-aktiv.at (Website in German only)